Copenhagen Atomics
Copenhagen Atomics: “Copenhagen Atomics’ 11.000 m2 reactor production facility in southern Copenhagen. Fixed price per reactor unit Each thorium molten salt reactor unit is priced at $50M, all-in, no overruns.”
What is the size of the machine (loop)?
“Version 5.6 is 120x80x215 cm (47x31x85 inches), it cannot stand up against a wall or other equipment when it is operating. You need a minimum 20 cm space around the loop in order for the heat to dissipate.”
View in the company profileWhat voltages does the loop need?
“By default the loop uses a 32 Amp, 350 – 420 Volt, 3 phase European CEE connector. It can run on 45 – 65 Hz. American customers typically buy a transformer, which is readily available to step down American 480 Volt industrial supply.”
View in the company profileDoes the loop come with CE marking or UL marking?
“The loops we sell in Europe come with CE marking. You can ask for our certification of conformity. For the US market, these are optionally fitted with UL approved cabling and electronics.”
View in the company profileCan I use the loop as a pumping station?
“Several of our customers use the loops as pumping stations, where they pump salt through some external equipment. Because molten salt compatible pumps are not readily available many of our customers simply use our loops as a pumping station.”
View in the company profile