“Integrated completion equipment: subsurface safety valve systems, permanent and retrievable packers, flow control, seals and completion accessories, plus fracturing and sand control. Pressure to 20,000 psi, temperature to 450 F, tubing 2-3/8 in to 13-3/8 in.”
“FEODE's outside-suspension well abandonment tool cuts and recovers casing and conductor in a single run, saving about 15-20 hours of rig time per well, roughly US$400,000-500,000.”
“FEODE is a leading offshore plug-and-abandonment specialist in China. It completed 168 offshore abandonment jobs on 166 wells in 2024-2025 and holds the national record for the deepest well abandonment, 2,083 m at YL10-6-4 in January 2024.”
“Yes. In 2026 field operations, FEODE validated China's first 3,000 m-class, 15,000 psi subsea wellhead system through the full installation-to-abandonment sequence.”
“FECCS is a fifth-generation continuous circulation system with one-key flow-path switching and PLC control, rated 7,500 psi, enabling uninterrupted circulation while drilling.”