Shenzhen Far East Oil Drilling Engineering
Shenzhen Far East Oil Drilling Engineering Ltd.: “China's pioneer in deepwater well abandonment, continuous circulation drilling, and subsea wellhead systems. Founded 1985. Provides subsea wellhead systems, well abandonment, continuous circulation drilling, completion equipment, drill pipe rental, fishing services, and supervision & inspection.”
How much rig time does FEODE's one-trip abandonment tool save?
“FEODE's outside-suspension well abandonment tool cuts and recovers casing and conductor in a single run, saving about 15-20 hours of rig time per well, roughly US$400,000-500,000.”
View in the company profileWhat is FEODE's position in China's offshore well abandonment market?
“FEODE is a leading offshore plug-and-abandonment specialist in China. It completed 168 offshore abandonment jobs on 166 wells in 2024-2025 and holds the national record for the deepest well abandonment, 2,083 m at YL10-6-4 in January 2024.”
View in the company profileWhat is the deepest water depth FEODE has performed well abandonment in?
“FEODE completed a deepwater well abandonment at 2,083 m water depth in the South China Sea, finished in a single trip.”
View in the company profileWhat are the ratings of FEODE's FE-15 subsea wellhead system?
“The FE-15 is rated to 3,000 m water depth, 15,000 psi, and -29 to 178 degrees C, certified to API 17D / PSL 4S with dual BV and CCS classification.”
View in the company profileHas FEODE's deepwater subsea wellhead been field-validated?
“Yes. In 2026 field operations, FEODE validated China's first 3,000 m-class, 15,000 psi subsea wellhead system through the full installation-to-abandonment sequence.”
View in the company profileWhat is FEODE's FECCS continuous circulation system?
“FECCS is a fifth-generation continuous circulation system with one-key flow-path switching and PLC control, rated 7,500 psi, enabling uninterrupted circulation while drilling.”
View in the company profileHow does FECCS perform on extended-reach wells?
“On a 9,508 m extended-reach well, FECCS reduced ECD fluctuation from about 17-21% to under 5%, improving wellbore stability and hole cleaning.”
View in the company profile